Home ProductsMineral Water Bottle PlantPLC Control Rotary Type Mineral Water Bottle Plant Plastic Bottle Filling
Certification
China SUZHOU MINGSTAR CO.,LTD certification
China SUZHOU MINGSTAR CO.,LTD certification
Your welding processing quality is great! Installation service is warm and careful. Good job!

—— Youssouph Diankha

Wonderful team! We had a nice experience working with your team!

—— Jenniffer Swift

This is a professional manufacturer! I am satisfied with your surface treatment technology!

—— Mohammed Mobaidin

Great! I will come back again, when updating our filling line.

—— Oscar Barrera

I'm Online Chat Now

PLC Control Rotary Type Mineral Water Bottle Plant Plastic Bottle Filling

large.img.alt
small.img.alt small.img.alt small.img.alt small.img.alt

Large Image :  PLC Control Rotary Type Mineral Water Bottle Plant Plastic Bottle Filling

Product Details:
Place of Origin: CHINA
Brand Name: MINGSTAR
Certification: ISO9001:2008
Model Number: CUSTOMIZED
Payment & Shipping Terms:
Minimum Order Quantity: 1
Price: Negotiated
Packaging Details: Safe package for exportation
Delivery Time: Negotiated
Payment Terms: Cash, T/T, L/C
Supply Ability: 100 sets per month
Detailed Product Description
Name: CGF16-16-6 Filling Machine Material: SUS304/316
Dimension(L*W*H): 2200X2100X2200MM Warranty Period: 2 Years
Capacity: 8000BPH Voltage: 380V, OME
Diameter Of Bottle Body: 50-100mm Cap Starndrad: Plastic Screw Cap
High Light:

mineral water plant

,

drinking water bottling plant

 
PLC Control Rotary Type Mineral Water Bottle Plant Plastic Bottle Filling
  
Product Description

 

PLC Control Rotary Type Mineral Water Bottle Plant Plastic Bottle Filling 0PLC Control Rotary Type Mineral Water Bottle Plant Plastic Bottle Filling 1

 

1. The main machine adopts advanced PLC control technology. The key parts adopt international famous products,such as Mitsubishi, Omron, Siemens, etc .
2. Low overall machine noise.
3. All parts are made of high quality Stainless steel.
4. Magnetic powered cap device ensures tightness and prevents damage of the caps.
5. Built-in safeguard mechanism ensures the safety of operator and machine.

 

Product Name
CGF16-16-6 Filling Machine
Material
stainless steel 304
Filling heads
16
Washing heads
16
Capping heads
6
Suitable bottle
PET bottle, Plastic bottle
Weight
4000KG
Main motor power
3KW

 

washing system
filling system
capping system
<1>All 304/316stainless steel rinse heads, water spray style inject design, more save water consumption and more clean
<2>304/316 Stainless steel Gripper with plastic pad, ensure minimal bottle crash during washing
<3> 304/316 stainless steel washing pump
<1> 304/316 Stainless steel high precision filling nozzle
<2> Filling volume adjustable in fine rank, same liquid level after filling
<3> All 304/316 stainless steel contact parts & liquid tank, fine polish, no death corner, easy to clean
<4> 304/316 stainless steel filling pump
<1> Place and capping system, electromagnetic capping heads, with burden discharge function, make sure minimum bottle crash during capping
<2> All 304/316 stainless steel construction
<3> No bottle no capping
<4> Automatic stop when lack of bottle

 
 
Our Service

 

1. Installation and Adjustment:

 

After the equipments are arrived at the customer’s site, the customers is responsible for unpacking and arranging the equipment according to the placement drawing; and do under our install-adjust technicians’ guidance.
According to requirement of water, electricity, air and steam consumption and the demands of quality level and pipeline, the User should connect the wire, cable and pipe of water, air and steam to the special position ordered in the installation area of production line ahead of time. Other relevant matching equipment and project should be finished before we adjust our equipment.
We’ll bring a suit of portable installation and adjustment tools ourselves during the period of installing and adjusting, the other instruments we need should be furnished by the customer for free including oxygen, acetylene angry, argon, etc. needed in the installation and adjustment site.
The customer should dispatch the capable person to accept training in the installing site.

 


2. Training :


We are responsible for offering the technical training to user. The training content includes the structure and maintenance of the equipments, control and operation of the equipments. The training lessons are finished in the process of installation and adjustment. Through training, users' technical staff can grasp and the skill of operation and maintenance proficiently, and deal with the general troubles in time.

 


3. Quality Assurance:


We guarantee the goods offered are brand-new, unused, with latest design and suitable material made, and we guarantee the specification of the equipments is consonance with the contract.
We are responsible for the fault and damage of the production line caused by our design, technology, manufacture, installation, adjustment and material defect etc that all belong to our responsibility.

 


4. Maintenance :


Offer 24 months maintenance period to the problem that caused by our design, manufacture and the material quality, and offer the relevant parts and effective service for free for above reason. We will offer a widely and favorable technical support, after service all the time after guarantee period.

Contact Details
SUZHOU MINGSTAR CO.,LTD

Contact Person: Alton

Tel: +8618261498917

Send your inquiry directly to us (0 / 3000)